BEFORE THE NUMBER

Make the bids
comparable.

A plumbing subcontract should identify systems, connection points, fixture responsibility, access work, permits and project phases. Square footage alone does not define the job.

Our proposal records the agreed scope, exclusions and open questions so your PM and superintendent can plan the next trade’s work.

WHERE WE FIT

Construction plumbing.
From the plans to the finish.

01 / ADUs

New units & conversions

  • Water supply and drain-waste-vent
  • Equipment and fixture rough-ins
  • Building connection scope and phasing
ADU plumbing →
02 / NEW CONSTRUCTION

Residential new builds

  • Specified underground plumbing
  • In-wall water, waste, vent and gas
  • Testing and finish installation
Prepare a plan package →
03 / REMODELS

Kitchens, baths & additions

  • Fixture relocation and rough-in
  • Existing-system connection review
  • Trim-out and equipment installation
Remodel plumbing →
04 / REPIPING

Water piping in renovation scope

  • PEX-A or copper proposals
  • Open-wall or occupied-work conditions
  • Access and restoration responsibilities
Repiping options →
05 / GAS

New drops & relocations

  • Appliance requirements and load review
  • Routing and connection scope
  • Testing and permit coordination
Send the gas scope →
06 / EQUIPMENT

Water heater integration

  • Equipment location and specifications
  • Water, gas, venting and condensate scope
  • Electrical work assigned to the right trade
Discuss equipment scope →

Drain cleaning, hydrojetting, sewer camera inspection, sewer lining and septic work are outside this offered subcontract scope. Identify specialty work separately in your bid package.

COMPARE THE SAME WORK

Set the boundaries
before award.

These are scope-review questions, not automatic inclusions. The written proposal assigns the work and allowances.

Plumbing bid responsibility checklist
BoundaryIdentify in the bid packageConfirm in the proposal
Building vs. site utilitiesWater, sewer and gas connection points, route lengths, elevations and meter information available.The exact plumbing work limits and any utility or civil scope by others.
Below-grade accessTrenching, bedding, backfill, compaction, sawcutting, coring and concrete replacement.Which trade performs each task; allowances and unknown conditions.
Fixtures & equipmentModel numbers, quantities, rough-in details and delivery responsibilities.Supply vs. installation, included parts and any purchase allowance.
Existing systemsVisible piping, tie-in locations, shutdown restrictions and demolition status.Investigation needs, access, repairs and conditions requiring a revised scope.
Permits & inspectionsJurisdiction, plan status, permit record and project inspection sequence.Responsible party, included fees or allowances and inspection coordination.
Finishes & closeoutDrywall, tile, waterproofing, paint, required records and payment milestones.Restoration by others or included work; agreed final testing and closeout items.
No fixture schedule? Our bidding assumption is owner-furnished, contractor-installed finish fixtures unless the written proposal states otherwise. Confirm models and rough-in requirements before installation work begins.

PRELIMINARY BUDGET VS. CONSTRUCTION BID

The plans determine
the proposal.

PUBLISHED ADU BUDGETING FRAMEWORK

$22–$24 / conditioned sq ft

This is an initial planning framework, subject to project-specific review—not a fixed installed price. Piping routes, units, fixtures, equipment, access and assigned site work can change the budget materially.

Budget ranges and starting prices are subject to change as labor, equipment and material costs change. Your current written quote confirms the price, scope and any quote-expiration date before approval.

What changes the number?

  • System layoutFixture count, stacked or separated wet areas, pipe sizes and connection distances.
  • Equipment & supplyWater heater selection, gas demand, recirculation, purchased fixtures and allowances.
  • Access & other tradesExisting conditions, excavation, concrete work, shutdowns and repeated mobilizations.
  • Plan completenessUnresolved details become stated assumptions or questions before the scope is finalized.

Bid target: 48 hours after a complete, reviewable plan package. We confirm the return date after checking scope and workload. A preliminary budget does not reserve installation dates.

BUILD A USEFUL BID REQUEST

What are we
pricing for you?

Choose the project details below. The checklist helps you prepare an email; review it and attach the current plans before sending.

Include with the plans

  • Current plan set, revision date and project location.
  • Fixture schedule and supply / installation responsibilities.
  • Connection points, work limits and scope assigned to other trades.
  • Bid due date and anticipated rough-in / finish dates.

We’ll review the package, identify questions and confirm the bid return date.

No request is sent automatically. Add your contact details and plans before sending. Prefer a call? 619-843-6692. You can also use our contact page.

COORDINATE THE NEXT TRADE

Three handoffs
to plan together.

01 / BEFORE MOBILIZATION

Scope & readiness

Resolve plan questions, confirm connection points and fixture models, assign permits and agree access, documents and work dates.

02 / BEFORE COVER-UP

Rough-in & inspection

Coordinate below-grade and in-wall work with concrete and framing. Agree testing, inspection readiness and responsibility for corrections before covering plumbing.

03 / BEFORE FINISH

Trim & closeout

Confirm surfaces, fixtures, equipment, utilities and access are ready. Coordinate final testing, inspection and the closeout items required by the agreed scope.

Changes need a scope decision. A fixture substitution, longer utility route or added mobilization can affect both price and timing. Record the change and confirm authorization before the added work proceeds.

GC DOCUMENTATION

Send the requirements
with the invitation.

Provide your subcontract, insurance requirements and closeout checklist at bid time so they can be reviewed before mobilization.

Insurance documents

Confirm certificate-holder details and any requested additional-insured endorsement with our team.

Written scope

Inclusions, exclusions, allowances, assumptions and proposal validity.

Progress billing

Agree payment milestones, supporting records and required release documentation.

Project contact

Identify the PM or superintendent handling access, schedule changes and scope decisions.

Coordinate the permit path.

Plumbing does not always require a separate trade permit from the building project. The City of San Diego states that plumbing plans are included with the building permit submittal when the work includes building construction plans.

We confirm the jurisdiction, permit responsibility, fees or allowances and inspection coordination in the proposal. Requirements elsewhere in the county depend on the local authority and project.

City of San Diego plumbing permit guidance ↗

CSLB C-36 plumbing classification ↗ · Check Tri Express License #926629 ↗

BEFORE YOU INVITE A BID

Questions from
general contractors.

Plan requirements, scope, pricing and coordination.

What plumbing subcontract work does Tri Express handle?

Tri Express Plumbing works with general contractors on ADUs, residential new construction, kitchen and bath remodels, repiping, gas piping and water heater work across San Diego County. Send the plans and required scope so our team can confirm project fit, capacity and scheduling.

How do I request a plumbing bid?

Email the current plans and revision date, project city, fixture schedule, scope boundaries, bid due date and anticipated construction dates to info@triexpressplumbing.com. Identify work already assigned to other trades. If the plans are incomplete, tell us whether you need a preliminary budget or a construction proposal.

How quickly can you return a bid?

Our target is 48 hours after receiving a complete, reviewable plan set and scope. We confirm the bid delivery date after reviewing the package and current workload. Large plan sets, missing details, site visits or unanswered questions can require more time. An email request does not reserve a start date.

How is subcontract plumbing priced?

We prepare a written proposal from the plans, fixture count, piping routes, equipment, site conditions and assigned responsibilities. The published ADU budgeting framework is $22–$24 per square foot of conditioned space, subject to project-specific review; it is not a fixed installed price or a substitute for a scoped bid. Budget ranges and starting prices are subject to change as labor, equipment and material costs change. Your current written quote confirms the price, scope and any quote-expiration date before approval.

Who supplies the finish fixtures?

If no fixture schedule is provided, our bidding assumption is owner-furnished, contractor-installed finish fixtures, unless the written proposal states otherwise. Confirm who purchases and delivers each fixture and provide model numbers, rough-in requirements and included parts before rough-in. Equipment and fixture allowances are listed separately where used.

Do you always need a separate plumbing permit?

No. The permit path depends on the jurisdiction and project. City of San Diego guidance says plumbing plans are included with the building permit submittal when the project includes building construction plans. Our proposal identifies permit responsibility, fees or allowances and inspection coordination so the plumbing scope aligns with the project permit.

Are excavation, demolition and wall repairs included?

Only when the written proposal includes them. Confirm the limits for site utilities, trenching, bedding, backfill, sawcutting, core drilling, concrete replacement, demolition, drywall and painting. Identify each connection point and which trade prepares access or restores finishes before comparing bids.

Can you provide insurance documents and subcontract paperwork?

Send your subcontract and insurance requirements with the bid request. We review the requested certificates, endorsements, payment milestones and closeout documents before mobilization. Certificate-holder information and additional-insured endorsements are different requests; availability and timing need confirmation for the project.

How do you coordinate rough-in and finish work?

We agree the plumbing phases and communication contact with your project manager or superintendent. Rough-in depends on access, approved layouts, connection points and other trade readiness. Finish work depends on completed surfaces, available fixtures and utilities. Confirm schedule changes and added work before proceeding.

Do you provide drain cleaning or sewer lining?

Drain cleaning, hydrojetting, sewer camera inspection, sewer lining and septic work are outside the scope offered on this subcontract page. New drain-waste-vent installation and specified building connections can be included in a construction proposal. Identify separate service or specialty work in the bid package.

Can we use Tri Express on recurring projects?

Yes. Send your typical project types, service areas, upcoming bid dates and subcontract requirements. Our team can review an initial project and discuss ongoing work. Each project still needs an agreed scope, current price and confirmed schedule.

YOUR NEXT PLUMBING BID

Send the plans.
Let’s define the work.

Email the current set, the work you want priced and your deadline. Our team will review the package and confirm the next step.

Useful on the first email

  • Project city and current plans
  • Fixture schedule and scope boundaries
  • Bid deadline and proposed work dates
  • PM / superintendent contact details
Page information: Tri Express Plumbing · Updated November 15, 2026.
Prepared from Tri Express’s supplied subcontract scope and bidding assumptions; permit wording checked against the linked City of San Diego guidance. Project scope, current pricing and scheduling are confirmed in writing.