Serving San Diego County since 2008CA License #926629

TRI EXPRESS PLUMBING · HOMEOWNERS & GENERAL CONTRACTORS

ADU plumbing.
Underground to finish.San Diego County

Tri Express Plumbing installs water, drain, vent and fixture plumbing for detached ADUs, additions and garage conversions. Send your plans so we can review the building scope, utility connections and work needed at each construction phase.

Serving San Diego since 2008CA License #926629Based in Chula Vista

START WITH THE CONNECTIONS

The floor plan is
only part of the bid.

An ADU plumbing estimate needs two clear scopes: the plumbing inside the unit and the work connecting it to water and wastewater service. The connection points, pipe routes and site responsibilities should be identified before the price is agreed.

Tri Express works directly with homeowners and as a plumbing subcontractor for general contractors. We review the plans and available site information, then define the proposed work in writing.

DIFFERENT BUILDINGS. DIFFERENT QUESTIONS.

What kind of ADU are you building?

01 / DETACHED

A new building

Review the site utility routes, elevations, building entry points and interior layout together. A short distance to the main house does not establish the sewer connection depth or water service capacity.

02 / GARAGE CONVERSION

Existing structure

Check the existing slab, access and proposed drain routes before assuming any stub-out can be reused. New kitchen, bathroom and laundry fixtures need defined connections.

03 / ATTACHED

An addition

Identify where the new plumbing joins the existing system, which rooms remain occupied, and what shutdowns or access openings the connection work may require.

04 / JADU

A smaller scope, defined

The approved kitchenette and bathroom arrangement controls the fixture scope. A qualifying JADU can share sanitation with the main home; do not assume every JADU includes a new full bathroom.

CONSTRUCTION-PHASE PLUMBING

Plan the work around
the next trade.

Underground, rough-in and finish work happen at different points in the build. Agree on the work and inspection requirements before the next stage is covered.

01 / UNDERGROUND

Before concrete & backfill

  • Building drain layout and specified cleanouts
  • Agreed sewer and water tie-in points
  • Site utility runs included in the proposal
  • Required testing and inspection coordination
Confirm before this phase

Connection locations, elevations, pipe lengths and access. Assign trenching, bedding, backfill and restoration. Review the inspection sequence before the pour or backfill is scheduled.

02 / ROUGH-IN & TOP-OUT

Before walls close

  • Hot and cold water piping
  • Drain, waste and vent piping
  • Shower valves and concealed rough-in parts
  • Water heater connections and specified gas piping
Confirm before this phase

Use the current drawings and fixture specifications. Review cabinet dimensions, finished wall depths, equipment placement and required access with the build team.

03 / FINISH & TESTING

When the rooms are ready

  • Specified sinks, toilets, faucets and shower trim
  • Kitchen and laundry plumbing connections
  • Water heater installation within the agreed scope
  • Testing and final plumbing inspection coordination
Confirm before this phase

Fixtures, trim and connection parts need to be available. Cabinets, counters, tile and electrical work must be ready for the plumbing tasks scheduled at this visit.

COMPARE THE SAME SCOPE

What is included beyond the building?

Two ADU bids can look far apart because they include different work. Ask each bidder to identify the following items.

Items to define before approving an ADU plumbing proposal
Scope itemWhat needs to be definedWhy it changes the bid
Building plumbingFixture count, piping materials, rough-in, equipment and finish connections.A studio, two-bath unit and multi-unit project have different plumbing requirements.
Site water & sewerConnection endpoints, included pipe lengths, elevations and existing-system review.A building-only quote may not include the full route to the water or sewer connection.
Earthwork & restorationTrenching, bedding, backfill, compaction, slab cutting and concrete restoration.Assign these tasks to Tri Express, the GC or another contractor in writing.
Equipment & fixturesWho supplies each item and which installation parts are included.Owner-furnished fixtures and contractor-supplied equipment need separate identification.
Permits & utilitiesPermit applicant, fees, utility applications and inspection responsibilities.Building permits, private utility work and public connections can involve separate approvals.
Unconfirmed conditionsAssumptions, allowances, excluded work and how changes will be priced.A sewer depth or connection location that has not been verified remains an open item.

The approved proposal controls the scope. There is no assumed blanket distance for off-building work; the included endpoints and lengths need to be stated.

GET A MORE USEFUL FIRST RESPONSE

Build your ADU bid checklist.

Choose the details you know. This prepares notes for an estimate request; it does not calculate a price or submit your information.

What to send Tri Express

  • Project city, site plan and ADU floor plans.
  • Plumbing sheets, fixture schedule and water heater specifications.
  • Water and sewer connection information, including any unknowns.
  • Requested bid scope, permit status and target schedule.

Select the details that apply to see which scope questions to include.

Review the email, add your details and attach the plans before sending. No message is sent automatically. You can also use our contact page.

PERMITS & CONNECTIONS

Use the permit path
for the actual site.

For City of San Diego projects with building construction plans, city guidance directs applicants to include the plumbing plans with the building permit submittal. Do not assume every ADU requires the same standalone permit package.

Separate private utility requirements can apply when underground domestic water and sewer serve more than one building. Work at the public water or sewer main may involve a right-of-way permit.

Chula Vista, other cities and unincorporated San Diego County have their own processes. Confirm jurisdiction, permit coverage, utility requirements and fees before work starts.

WATER HEATING & APPLIANCES

Choose equipment
with the plans.

The water heater needs to match the approved energy compliance documents, hot water demand and installation space. Tank, tankless and heat pump systems have different electrical, venting, condensate and access requirements.

Identify the plumbing work and electrical work separately. Gas piping belongs in the scope only where the approved design calls for it; a gas system is not assumed for every ADU.

Official manufacturer product information. Equipment selection is project-specific.

California Energy Commission ADU guidance ↗

Explore our water heater services →

FOR GENERAL CONTRACTORS

A bid you can compare.
A scope you can schedule.

Send the current drawing set and identify the plumbing package you want quoted. If fixtures are not scheduled, our estimating starting point is owner-furnished fixtures installed by Tri Express, subject to the written proposal.

  • Separate building work from site work.Identify tie-in points, included distances and any work carried by the civil or site contractor.
  • Send the equipment schedule.Include water heaters, fixture models, appliance loads and special connection details.
  • Flag what is still unresolved.Unknown sewer elevations, utility sizes or owner selections need a stated assumption or follow-up.
  • Coordinate each phase.Include the underground, framing, inspection and finish milestones that affect the plumbing work.

BEFORE YOU REQUEST A BID

ADU plumbing questions.

Scope, utility connections, fixtures and permit planning.

What does ADU plumbing include?

An ADU plumbing proposal can include building drains, vents, hot and cold water piping, the water heater, specified gas piping and fixture connections. Site water and sewer runs, tie-ins, trenching, restoration, permits and utility work need to be identified separately so the building scope and off-building scope are clear.

How much does ADU plumbing cost in San Diego?

ADU plumbing is priced from the plans, fixture count and site conditions. Utility connection locations, pipe distances, access, elevation, water heater requirements and who handles excavation can change the price substantially. Ask for a written proposal that identifies the building work, site utility work, fixtures, allowances and exclusions.

Can my ADU connect to the existing sewer?

That depends on the approved design and the existing system. The connection location, pipe condition, size, route and elevations need to be reviewed. Do not assume gravity drainage is feasible from distance alone. If the project involves septic, include the applicable approvals and specialist information with the plans.

Does every ADU need a separate water meter?

Do not assume either a shared meter or a separate meter will be approved. The arrangement depends on the project, existing service and requirements of the serving water agency. A utility-issued meter, a private submeter and a dedicated shutoff serve different purposes. Confirm the proposed arrangement before pricing new service work.

Is the plumbing permit separate from the ADU building permit?

The permit path depends on the jurisdiction and scope. City of San Diego guidance says to include plumbing plans with a building permit submittal when the project includes building construction plans. Separate private-utility or right-of-way permits can also apply. Confirm the applicant, covered scope, fees and inspections for the actual project.

Which water heater should an ADU use?

Use the equipment and installation requirements in the approved plans and energy compliance documents. Tank, tankless and heat pump systems have different space, electrical, venting and piping needs. Do not select a unit only by ADU floor area. Confirm hot water demand, equipment access and the work assigned to the electrician.

Does a JADU have to have its own bathroom?

Not always. Official California guidance allows a JADU to have separate sanitation facilities or share them with the primary home. The permitted layout determines the plumbing scope. An ADU and a JADU should not be priced as though they always require the same fixtures and connections.

Can I supply the fixtures for the ADU?

Yes. Tri Express installs customer-supplied fixtures. Identify who supplies the sinks, faucets, toilets, shower valves and trim, and provide model numbers before rough-in. If the plans have no fixture schedule, our estimating starting point is owner-furnished fixtures installed by Tri Express, subject to the written proposal.

Do you handle the excavation and concrete work?

The written proposal needs to state who handles trenching, bedding, backfill, compaction, slab cutting and concrete restoration. Also identify the agreed connection points and included pipe lengths. Those items should not be assumed to be part of every building-plumbing quote.

Can you quote from plans before construction starts?

Yes. Send the site plan, floor plans, plumbing sheets, fixture schedule, energy documents and project location. Identify the requested bid scope and start date. If utility locations or other site conditions remain unconfirmed, the proposal needs clear assumptions, allowances or exclusions for those items.

SEND THE PLANS. DEFINE THE WORK.

Let’s review your
ADU plumbing scope.

Send the drawing set, project city and requested timing. If you’re still planning, describe the ADU and tell us which connection details are known.

A useful bid package includes

  • Site plan and current floor / plumbing plans
  • Fixture schedule and water heater / energy documents
  • Connection locations, elevations and utility information available
  • Building versus site-work boundaries
  • Permit status, contractor contact and requested schedule
Page information: Tri Express Plumbing · Updated November 16, 2026.
Prepared from Tri Express’s service scope and official city and state planning references. Project requirements are confirmed against the plans and applicable approvals. Verify CA License #926629 ↗