Larger or altered piping
The device and connection arrangement must suit the actual water line. Piping modifications are identified in the proposal.
TRI EXPRESS PLUMBING · LICENSED PLUMBING CONTRACTOR
Tri Express Plumbing installs Moen Flo on residential water lines, helps with app setup and tests the completed work. Send photos of your main line to start a quote. Installation verification documentation is included.
From $1,195 · Device + standard 3/4-inch installation
Starting prices are subject to change with device and material costs. Your current written quote confirms the price and scope before approval.

MORE THAN A LEAK ALERT
Moen Flo combines water monitoring with a valve installed in the water supply line. It can identify unusual water use, send alerts and close the valve when its monitoring calls for a shutoff.
It is a way to reduce water-loss risk, not a repair for worn pipes or a guarantee against all damage. The installation location determines which downstream plumbing is monitored and controlled.A CLEAR STARTING PRICE
Starting prices are subject to change with device and material costs. Your current written quote confirms the price and scope before approval.
Pipe size, material, usable straight pipe, device access and the power arrangement all affect installation. A photo helps us see the setup; it does not confirm every concealed condition.
The device and connection arrangement must suit the actual water line. Piping modifications are identified in the proposal.
Access panels, wall openings and restoration need an agreed scope. The device must remain accessible for service.
Confirm whether an approved cord arrangement is possible or electrical work is needed. Additional work is quoted separately.
We offer installation-only quotes. Send the model number and photos before scheduling.
TRI EXPRESS INSTALLATIONS
These photos come from Tri Express’s Moen Flo installation projects. Each location has a different piping and access arrangement. Open any photo to see it full size.




The Eastlake installation is pictured at the top of this page. Project photos show the work at those properties; your installation is reviewed separately.
WHAT WE CHECK BEFORE INSTALLATION
We review the proposed location, existing shutoff and pressure regulator, available pipe and system branches. Fire sprinklers, irrigation and other connections need to be identified before deciding placement.
Moen says not to install Flo on fire sprinkler or suppression systems or hot water distribution lines.
Check for a 2.4 GHz Wi-Fi signal where the device will sit and a suitable power connection. Any extension arrangement needs to follow Moen’s guidance for the model and environment.
Real-time alerts and remote control depend on an active internet connection.
Agree on any access work, expected water interruption and setup assistance. The device should be reachable for service, and the homeowner should have access to the account and app.
Keep your Wi-Fi password private; enter it yourself during setup.
START WITH A FEW PHOTOS
Choose what you know. We’ll prepare a text you can review and send. This is a planning checklist, not an automatic quote or booking.
Do not send passwords, policy numbers or other sensitive account details. If an insurer has a deadline, tell us the date and required proof.
Your messaging app opens so you can review the request, attach photos and send it. Nothing is submitted automatically. Prefer a form? Use our contact page.
IF YOUR INSURER REQUESTED IT
Ask your agent which device and installation details the carrier accepts, the deadline, and what proof you must submit. A general smart-home discount and a specific underwriting requirement are different questions.
Tri Express includes installation verification documentation. Your carrier decides whether it meets the policy requirement and whether any credit applies. Installation does not automatically activate a discount.
INCLUDED INSTALLATION RECORD
Tell us before the visit if the carrier requires a particular form. We can review the requested installation documentation; we do not decide coverage or renewal.
THE INSTALLATION VISIT
Send the photos, project location and any carrier deadline. We review the model, access and work needed.
Confirm the price, included materials, any access or electrical work, and the planned water interruption.
Install the agreed device and connections, restore the water and test the completed plumbing and valve operation.
Assist with the app and Wi-Fi setup, review operation, and provide the installation record.
BEFORE YOU BOOK
Pricing, power, app setup and insurance documentation.
Tri Express’s standard 3/4-inch Moen Flo package starts at $1,195, including the device, standard plumbing installation, app and Wi-Fi setup assistance, testing and an installation verification letter. Starting prices are subject to change with device and material costs. Your current written quote confirms the price and scope before approval. The final quote also depends on pipe size, access, existing piping and the power arrangement. Larger lines, access work and other modifications are quoted separately.
Yes. Send the model number and photos of the main water line for an installation-only quote. We need to review device sizing, connection parts, access and power before confirming the work.
Moen specifies a 2.4 GHz Wi-Fi network for setup and updates. The device also needs a suitable power connection. Review the outlet location and the approved power-cord arrangement for the specific model before installation. Do not assume a regular indoor extension cord is suitable outdoors.
Moen describes the shutoff as water-resistant and suitable for outdoor use, but not submersion. The installation still needs to follow the model instructions. For concealed piping, the device and connections need accessible service space; an access panel or piping changes may be part of the quote.
Your carrier decides which devices, installation details and proof it accepts. Before booking, ask your agent to confirm the required device, deadline, documentation and any available discount in writing. Tri Express provides an installation verification letter, but cannot promise policy approval, renewal or premium savings.
Our installation documentation includes the device model and serial number, installation date and location, and Tri Express Plumbing’s contractor license number. Tell us before the visit if your carrier has a specific form or photo requirement. You submit the documentation to the carrier or agent for their review.
No. Moen Flo monitors the water passing through the installed device and can close its valve when its monitoring identifies conditions that call for shutoff. It does not repair damaged piping or provide a guarantee against every leak, water loss or source of flooding. Device placement, power and settings matter.
Moen says the device can continue monitoring and store data locally during a Wi-Fi outage. Real-time alerts and remote control require an active internet connection. A power outage is a different issue; review the model’s power and backup options with Moen.
Moen’s support page says the device’s features and data do not require the former monthly data subscription. Optional FloProtect or other Moen service plans have separate charges, eligibility rules and coverage terms. Check the current manufacturer terms for the plan you are considering.
The time depends on pipe access, required modifications, device setup and testing. We confirm the planned visit and expected water shutoff after reviewing the installation. A concealed line, an unsuitable power arrangement or additional pipe work can change the scope and duration.
Use the current Moen Flo App. Moen says remote features in the older Flo by Moen App stopped being supported on November 1, 2026. Existing users should follow Moen’s migration instructions rather than attempt to register the same device as new.
LOCAL INSTALLATION SERVICE
Based in Chula Vista. Contact our team about installation in your neighborhood. Links below open local plumbing pages or our contact page.
LET’S REVIEW YOUR WATER LINE
Tell us your city, whether you own the device, and any installation deadline. We’ll review what is needed before confirming your quote.
From $1,195
For a standard 3/4-inch package. Starting prices are subject to change with device and material costs. Your current written quote confirms the price and scope before approval. Larger lines, concealed piping and additional modifications are quoted separately.