New units & conversions
- Water supply and drain-waste-vent
- Equipment and fixture rough-ins
- Building connection scope and phasing
TRI EXPRESS PLUMBING · FOR GENERAL CONTRACTORS
ADUs, residential new builds and remodels—from underground and rough-in through finish installation. Send Tri Express Plumbing your plans for a written proposal that defines the work, trade boundaries and schedule assumptions.
Bid target: 48 hours after a complete plan package. Confirm turnaround and availability when requesting a proposal.
BEFORE THE NUMBER
A plumbing subcontract should identify systems, connection points, fixture responsibility, access work, permits and project phases. Square footage alone does not define the job.
Our proposal records the agreed scope, exclusions and open questions so your PM and superintendent can plan the next trade’s work.WHERE WE FIT
Drain cleaning, hydrojetting, sewer camera inspection, sewer lining and septic work are outside this offered subcontract scope. Identify specialty work separately in your bid package.
COMPARE THE SAME WORK
These are scope-review questions, not automatic inclusions. The written proposal assigns the work and allowances.
| Boundary | Identify in the bid package | Confirm in the proposal |
|---|---|---|
| Building vs. site utilities | Water, sewer and gas connection points, route lengths, elevations and meter information available. | The exact plumbing work limits and any utility or civil scope by others. |
| Below-grade access | Trenching, bedding, backfill, compaction, sawcutting, coring and concrete replacement. | Which trade performs each task; allowances and unknown conditions. |
| Fixtures & equipment | Model numbers, quantities, rough-in details and delivery responsibilities. | Supply vs. installation, included parts and any purchase allowance. |
| Existing systems | Visible piping, tie-in locations, shutdown restrictions and demolition status. | Investigation needs, access, repairs and conditions requiring a revised scope. |
| Permits & inspections | Jurisdiction, plan status, permit record and project inspection sequence. | Responsible party, included fees or allowances and inspection coordination. |
| Finishes & closeout | Drywall, tile, waterproofing, paint, required records and payment milestones. | Restoration by others or included work; agreed final testing and closeout items. |
PRELIMINARY BUDGET VS. CONSTRUCTION BID
PUBLISHED ADU BUDGETING FRAMEWORK
$22–$24 / conditioned sq ft
This is an initial planning framework, subject to project-specific review—not a fixed installed price. Piping routes, units, fixtures, equipment, access and assigned site work can change the budget materially.
Budget ranges and starting prices are subject to change as labor, equipment and material costs change. Your current written quote confirms the price, scope and any quote-expiration date before approval.
Bid target: 48 hours after a complete, reviewable plan package. We confirm the return date after checking scope and workload. A preliminary budget does not reserve installation dates.
BUILD A USEFUL BID REQUEST
Choose the project details below. The checklist helps you prepare an email; review it and attach the current plans before sending.
We’ll review the package, identify questions and confirm the bid return date.
No request is sent automatically. Add your contact details and plans before sending. Prefer a call? 619-843-6692. You can also use our contact page.
COORDINATE THE NEXT TRADE
Resolve plan questions, confirm connection points and fixture models, assign permits and agree access, documents and work dates.
Coordinate below-grade and in-wall work with concrete and framing. Agree testing, inspection readiness and responsibility for corrections before covering plumbing.
Confirm surfaces, fixtures, equipment, utilities and access are ready. Coordinate final testing, inspection and the closeout items required by the agreed scope.
GC DOCUMENTATION
Provide your subcontract, insurance requirements and closeout checklist at bid time so they can be reviewed before mobilization.
Confirm certificate-holder details and any requested additional-insured endorsement with our team.
Inclusions, exclusions, allowances, assumptions and proposal validity.
Agree payment milestones, supporting records and required release documentation.
Identify the PM or superintendent handling access, schedule changes and scope decisions.
Plumbing does not always require a separate trade permit from the building project. The City of San Diego states that plumbing plans are included with the building permit submittal when the work includes building construction plans.
We confirm the jurisdiction, permit responsibility, fees or allowances and inspection coordination in the proposal. Requirements elsewhere in the county depend on the local authority and project.
City of San Diego plumbing permit guidance ↗
CSLB C-36 plumbing classification ↗ · Check Tri Express License #926629 ↗
BEFORE YOU INVITE A BID
Plan requirements, scope, pricing and coordination.
Tri Express Plumbing works with general contractors on ADUs, residential new construction, kitchen and bath remodels, repiping, gas piping and water heater work across San Diego County. Send the plans and required scope so our team can confirm project fit, capacity and scheduling.
Email the current plans and revision date, project city, fixture schedule, scope boundaries, bid due date and anticipated construction dates to info@triexpressplumbing.com. Identify work already assigned to other trades. If the plans are incomplete, tell us whether you need a preliminary budget or a construction proposal.
Our target is 48 hours after receiving a complete, reviewable plan set and scope. We confirm the bid delivery date after reviewing the package and current workload. Large plan sets, missing details, site visits or unanswered questions can require more time. An email request does not reserve a start date.
We prepare a written proposal from the plans, fixture count, piping routes, equipment, site conditions and assigned responsibilities. The published ADU budgeting framework is $22–$24 per square foot of conditioned space, subject to project-specific review; it is not a fixed installed price or a substitute for a scoped bid. Budget ranges and starting prices are subject to change as labor, equipment and material costs change. Your current written quote confirms the price, scope and any quote-expiration date before approval.
If no fixture schedule is provided, our bidding assumption is owner-furnished, contractor-installed finish fixtures, unless the written proposal states otherwise. Confirm who purchases and delivers each fixture and provide model numbers, rough-in requirements and included parts before rough-in. Equipment and fixture allowances are listed separately where used.
No. The permit path depends on the jurisdiction and project. City of San Diego guidance says plumbing plans are included with the building permit submittal when the project includes building construction plans. Our proposal identifies permit responsibility, fees or allowances and inspection coordination so the plumbing scope aligns with the project permit.
Only when the written proposal includes them. Confirm the limits for site utilities, trenching, bedding, backfill, sawcutting, core drilling, concrete replacement, demolition, drywall and painting. Identify each connection point and which trade prepares access or restores finishes before comparing bids.
Send your subcontract and insurance requirements with the bid request. We review the requested certificates, endorsements, payment milestones and closeout documents before mobilization. Certificate-holder information and additional-insured endorsements are different requests; availability and timing need confirmation for the project.
We agree the plumbing phases and communication contact with your project manager or superintendent. Rough-in depends on access, approved layouts, connection points and other trade readiness. Finish work depends on completed surfaces, available fixtures and utilities. Confirm schedule changes and added work before proceeding.
Drain cleaning, hydrojetting, sewer camera inspection, sewer lining and septic work are outside the scope offered on this subcontract page. New drain-waste-vent installation and specified building connections can be included in a construction proposal. Identify separate service or specialty work in the bid package.
Yes. Send your typical project types, service areas, upcoming bid dates and subcontract requirements. Our team can review an initial project and discuss ongoing work. Each project still needs an agreed scope, current price and confirmed schedule.
BASED IN CHULA VISTA
Send the project location and anticipated dates so our team can confirm coverage and availability. Area links open our local plumbing page or contact page.
YOUR NEXT PLUMBING BID
Email the current set, the work you want priced and your deadline. Our team will review the package and confirm the next step.